01
Production-Readiness Assessment
Week 1- Codebase quality report with severity ratings
- Architecture risk assessment
- Infrastructure gap analysis
- Prioritized remediation roadmap
8-WEEK PRODUCTION TRANSITION
We Bridge the Gap Between Prototype and Production.
Your Replit app got 500 upvotes. Your Loveable prototype wowed the investors. Your Cursor-built MVP landed the first 50 users. Now what? We take what you've built and make it production-ready - infrastructure, security, testing, monitoring, and all.
Your Prototype
Production-Ready
Works on localhost
Works on AWS/GCP with auto-scaling, CDN, and failover
No authentication or basic auth
OAuth 2.0, JWT, RBAC, session management, MFA
console.log debugging
Structured logging, APM, error tracking, alerting
No tests
Unit, integration, E2E, load testing, security scanning
Manual deployment via CLI
CI/CD pipelines, blue-green deploys, and rollback capability
SQLite or in-memory data
Managed databases, migrations, backups, and replication
No rate limiting
Rate limiting, DDoS protection, WAF, CSP headers
Single environment
Dev, staging, production environments with parity
Why GeekyAnts
OUR ENGAGEMENT MODELS
4–6 Weeks
6–12 Weeks
Ongoing
INDUSTRY AGNOSTIC
TECHNICAL EXPERTISE

TensorFlow

PyTorch

Scikit-learn
Firebase

LangChain

LlamaIndex

Hugging Face

AWS SageMaker

Google Vertex AI

Pinecone

AWS Bedrock

Weaviate

Chroma

Qdrant
GitHub

Git

LangGraph

Crew AI

AutoGen
SQL

Apache Spark

Pandas

NumPy
WHERE PROTOTYPES FAIL
OUR PROCESS
01
02
03
04
05
THE 50 POINT STANDARD
PROVEN RESULTS
Book a Discovery Call
TRUSTED BY

EXPLORE OUR CAPABILITIES
FEATURED CONTENT
What You Need to Know
Whether you’re navigating AI adoption, modernizing legacy systems, or scaling a product - we start by listening. No pitch deck. No template. A real conversation.